Project Reviews - Cethana Updated & Macquarie Wharf #3

For more details or assistance with registration contact Helen at the TAS Branch on 0414 957 638 or [email protected].

Hydro

When

Thursday, 28 March 2019
3:30 PM - 6:00 PM

Where

Derwent Sailing Squadron
23 Marieville Esp , Sandy Bay TAS 7005

Overview

An inspection of the Cethana Underground Power Station in March 2013 determined that exposed sections of reinforcement elements installed throughout the complex were heavily corroded to the point where many could be considered destroyed. Work commenced in May 2014 and was completed in October 2014 by mining contractor Mancala. Pitt & Sherry with Mancala conducted installation trials on all lengths of rock bolts and cable bolts at the angles at which they were to be installed in the rockmass.  Trials were conducted by installing rock bolts and cable bolts in pipes of similar diameter and length to the boreholes in which they would be installed. The work program was undertaken and successfully completed on time and budget. The entire rehabilitation program was completed without material interruption to power generation. 
Corrosion in prestressed concrete structures presents far greater challenges due to the nature of the prestressed construction, including hydrogen embrittlement, electrical continuity and general repair of elements under stressing compression. 
The presentation will discuss these challenges including the benefits and methods of preventing and delaying strand corrosion and the modern methods of repair and corrosion protection of these elements. The presentation will feature Tasmanian prestressed repair projects and others from around Australasia and overseas

Prices

CIA Member or Sponsor $65.00 MBA ACA ACRA Member $91.00 Non Member $117.00 CIA Retirees or Student $32.50 CIA TAS Sponsor $0.00

Presenters

Mr. Peter Hills
Principal Mining Geotechnical Engineer - Pitt & Sherry

Mr. Ian Godson
Managing Director - Infracorr Consulting Pty Ltd

Topics

Project Review 1 - “Cethana Corrosion Rectification Update” as “Cethana Ground Support and Reinforcement Rectification Update”

Project Review 2 - Remediation of Prestressed Concrete Structures



 

Program

3.30 pm Registration Commences
4.00 pm Welcome & Introduction
4.15 pm Commencement of Speaker Presentations
6.00 pm Networking and Light Refreshments

Communication Devices

 
Please note that audio and video recording or taking photographs is prohibited during this event without express approval from the Concrete Institute of Australia.

By making a booking you are acknowledging that you have read and accept the Concrete Institute of Australia’s
Terms of Service.