Overview

Sydney Metro City & Southwest involves extending the metro rail under Sydney Harbour, through new underground city stations and beyond to the south west. The tunnelling will deliver twin new metro railway tunnels below the centre of Sydney and deep under Sydney Harbour as part of Australia’s biggest public transport project, Sydney Metro.

The John Holland, CPB, and Ghella joint venture engaged Arcadis and BG&E (ABJV) to do the tunnel station excavations, surface civil works and selected structures. ABJV’s work involves the dive structures at Chatswood and Sydenham, the station excavations at Waterloo and Crows Nest, and all the shaft excavations and temporary works for access at Pitt street, Martin place and Victoria Cross. In addition, ABJV is also providing the excavation and tunnel station design for Barangaroo Station.

This presentation will outline the general engineering basis for the design of the shoring solutions developed for the locations mentioned above.

Prices

CIA Members $88.00 CIA Student Members $22.00 Non-Members $110.00 CIA Retired $44.00

Presenters

Dr. Matthew Ing
Transport Lead - BG&E NSW

Mr. Daniel Thomy
Associate Technical Director - Arcadis

Topics

Speakers:

Dr Matthew Ing, BG&E NSW Transport Lead
Dr Matthew Ing has 18 years experience in civil and structural design experience in Australia, New Zealand and the UK and 12 years of technical leadership roles. Matthew has led large design teams leading complex civil and structural projects with multiple multidisciplinary interfaces and stakeholder interactions. Matthew has a demonstrable record in challenging design solutions to reduce construction time and cost. His recent experience includes structures team lead for the Sydney Metro City South West – Tunnels and Station Excavation Works (TSE), where he was responsible for the design of 6 station excavations, 2 dive structures, Baranagroo Station and two portal structures as well as substantial temporary works design to a demanding program. Prior to the TSE, Matthew was structures lead for 73 bridges on the Pacific Highway upgrade, including the 800m long Shark Creek. 

Daniel Thomy, Arcadis Associate Technical Director
Daniel has 14 years’ experience in civil and structural engineering in all aspects of the project delivery cycle from preliminary and detailed design through construction phase services, proof engineering and independent certification. His experience includes the planning, managing, procuring and cost control for major civil works projects. His areas of experience include the structural design, construction and inspection of multiple structure types- including bridges, heavy civil structures, deep excavations and buildings.
On the Sydney Metro City South West -Tunnels and Station Excavation Works (TSE), Daniel was the design lead for the open excavation shoring at Crows Nest Station and Waterloo Station and is now the Construction Phase Services Manager for the design joint venture between Arcadis and BG&E.
 

Program

5.00 pm Registrations Open
5.25 pm
 
Welcome and Introduction
5.30 pm
 
Presentations Commence
6.45 pm
 
Discussion and Question Time
7.00 pm
 
Networking
Drinks and light refreshments will be served
8.00 pm Close

Communication Devices

 
Please note that audio and video recording or taking photographs is prohibited during this event without express approval from the Concrete Institute of Australia.

By making a booking you are acknowledging that you have read and accept the Concrete Institute of Australia’s
Terms of Service.