Temporary Design Works for Concrete (Pt 2)

Pricing

Members Price
Non-Member Price
Learning Module
$33.00
$66.00
Membership
$250.00
Total (including GST)
$33.00
$66.00
 

Members are able to access discounts on this and a number of other products and services. Click here to find out more or to join as a Member

Overview

Back propping of concrete slabs during construction is a subject often misunderstood in the industry. To address this, Justin covers the theory and detailed methods recommended for calculating back propping loads, and he explores the factors to consider when assessing multistorey load distribution.

Speakers
Justin Smith - Director of Construc Pty Ltd

Justin is a specialist in construction methodology and temporary works consulting engineering company. For the last 26 years, Justin has specialised in construction-related engineering and design, specifically structural temporary works systems based on formwork, back propping, scaffold, swing stages, mast climbers, material handling (including crane lifting of large reinforcement cages), demolition, high-rise construction, dam construction, tunnel construction and bridge construction. Justin also has extensive experience in temporary works accident investigation and project recovery engineering.

 

Learning Module Standard Inclusions
By purchasing this Online Learning Module, you will have the opportunity to view recorded presentations (video and audio) at your own pace over a 90-day period.

Total viewing time - 60 min